About Us

About GDCL

Gannon Dunkerley & Co., Ltd. is a pioneer Construction Organization established in 1924, operating in India and abroad and undertaking Construction of Engineering Projects for both Public and Private Sector Clients. The Company is also widely known in the Construction Industry in the name of ‘GDCL’, short form of Gannon Dunkerley & Co., Ltd. 

To keep pace with the rapidly growing Indian economy and to cater to the rapid development in both Infrastructure and Industrial fields, GDCL, since its inception, has been lending its best contribution in all the fields of Nation Building, be it for Infrastructure development, e.g. Roads & Highways, Bridges, Flyovers, Railways, Metro Rails, Airports, etc. or be it for Industrial development such as setting up of Power Plants, Oil Refineries, Cement Plant, Steel Plants, Alumina Plants and other Ferrous and Non-Ferrous metal plants, Sugar Mill, Textile Mill, etc. on a large scale.

The Company has also executed many Landmark Building Projects and has been executing many Real Estate and High-rise Building Projects such as Town-ships, Residential & Commercial Complexes, Malls, Data Centers, IT Buildings, Institutional Buildings, Hospitals and Medical Colleges etc.

Besides above, GDCL , through its specialized Water Management Division, has also been taking care of the Environment by playing its role in undertaking major Environmental Construction Projects such as mega Water and Effluent Treatment Plants, Sewage Treatment Plants, Irrigation and Canal Projects, etc. on Turnkey basis. GDCL is also in the business of supplying and installing Baggage Conveyors for the Airports across the Country through its Material Handling Division.

GDCL’s Pre-stressed Concrete Railway Sleeper Factory Unit at Rayagada, Odisha contributes to Indian Railways by supplying about 1 (One) Lakh sleepers annually.

In order to provide the Services by meeting all international standards of Quality, Environmental & Occupational Health Safety the Company has obtained IMS Certification covering ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 to demonstrate itself as a Quality, Occupational Health Safety and Environmental compliant Engineering Construction Company.

GDCL has a distinct privilege of successfully executing over 3000 projects in India and abroad with consistent quality assurance, cost control and adherence to milestones in a safe environment.

The Company has four Regional Engineering Divisions located at Delhi, Mumbai, Hyderabad and Kolkata besides Water Management Division at Delhi and Material Handling Division at Kolkata to cater to the needs of Clients across the country under one roof as General/EPC Contractors.

Our Vision & Mission

Anticipating industrial and infrastructure growth in all sectors to match the National Economy, the Company displayed its vision in strengthening the construction platform in Infrastructure, Industrial, Environmental and Building Projects.

The Company has qualified, experienced and competent workforce as well as modern Plant and Machinery to take up execution of various mega Projects of Buildings & Factories, Roads and Highways, Railways, Airports, Bridges & Flyovers, Power Plants, Refineries, Steel and Non-Ferrous Metal Plants, Cement Plants etc with Quality and Safety to full satisfaction of the Clients. Considering the Clients’ preference to award Turnkey Contracts, the Company has provided a platform to execute Mechanical and Electrical works besides Civil Engineering works under one set up of the organization at a Division for one stop solution.

The Company with its diversified profile of technical operations, to meet challenges in the country’s development, has adopted the Enterprise Resource Planning (ERP) for efficient monitoring and systematic Management of Projects pan India and abroad.

The Mission and Vision of the Company has been validated with a large number of satisfied Clients issuing certificates of appreciation and awards for safety and quality in executing Projects on schedule along with repeated Orders.

Director's Message

It is my privilege to welcome you on our website. M/s Gannon Dunkerley & co., Ltd. started in 1924 has gradually grown to provide construction services for big Industrial Projects (Power Plants, Steel Plants, Cement Plants, Oil Refineries, etc.), Infrastructure Projects (Highways, Railways, Bridges/Flyovers, Metros, etc.), Commercial/Residential Buildings, Water/Sewage Treatment Plants and distribution network, etc.

In line with the company’s policy projects are managed from four Divisional Offices in Delhi, Mumbai, Kolkata and Hyderabad to provide convenient reach to our clients. We have got a team of qualified, experienced, competent and dedicated Technical and Commercial staff. The Company has also acquired Modern Plant & Machinery to adopt the latest technology in execution of the projects.

I and my colleagues in the Company want to assure our clients and customers that their projects will be completed within time schedule while adhering to Quality, Occupational Health & Safety and Environmental Protection norms. Having executed over 5000 projects successfully in India and abroad our efforts shall be directed for greater client’s satisfaction. We look forward to continued support of our valued clients in all sectors of construction and commit our dedication to “Build value” for their projects with complete solution under one roof.

_MANOJ KUMAR SINGH (1)

Mr. Manoj Kumar Singh

Meet Our Management

Board of Directors

Parag C. Mehta

Independent Director

Manoj Kumar Singh

Managing Director

Pragati Mundhra

Promoter Director

Key Personnel & Management Team

Manoj Kumar Singh

Managing Director

R.P. Agarwal

CFO & Co. Secretary

Ashis Kumar Pal

COO, Kolkata Division

B.N. Nagaraj

COO, Mumbai Division

Pravin Jain

COO, Water Management Division

B.S. Rao

COO, Hyderabad Division

Rajendra Kumar pandey

Deputy COO, Delhi Division

Key Personnel & Management Team

Integrated
Management System

Gannon Dunkerley & Co., Ltd. (GDCL) is an ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certified company whose Integrated Management System (IMS) is accredited by URS, UK. All projects of GDCL are executed in accordance with approved Plan under IMS which are regularly audited by Internal Auditors and by URS representatives. Managing Director (MD) holds Quarterly Management Review Meetings with all Divisional Heads to review the Integrated Management System in GDCL and monitors the set targets given to various Divisions. He reviews the status of Quality, Occupational Health, Safety and Environment (Q & HSE) and gives directions for continual improvement of Integrated (Q & HSE) Management System in GDCL.

Highest priority is given to Quality, Health, Safety and Environment by the company. The Q & HSE Policy enunciated by the Company lays emphasis on Quality, Health, Safety and Environment through a structured approach. Systems and procedures have been laid down for implementing at all stages of construction. Head of the Q & HSE Department is Management Representative (MR) and operates in MD’s Office and directly reports to the MD on all matters relating to Q & HSE. MR is assisted by the Associate Management Representative (AMR) of each Division. Each AMR in turn monitors implementation of Q & HSE measures through Site Quality & HSE Officers posted at the Project Sites. Divisional Heads are assisted by Quality and HSE Managers to oversee the working of Quality and HSE Officers at the Project Sites. Integrated Management System is operating as per ISO 9001: 2015, ISO 14001:2015 and ISO 45001:2018 in all Offices and Project Sites of GDCL. Salient features of Q & HSE Management Systems adopted are detailed below:

Proactive MeasuresMonitoring Measures
Quality ManualInternal Audit of the Project Site & Office
Procedures ManualRegular Monthly Returns from the Project Sites
Quality Plan in consultation with the ClientsTour Reports of the Project Coordinators
Regular Quality Meetings with the Client where Non-conformities if any are discussed and resolvedReview Meeting by Project Coordinator during site visits.
Root Cause Analysis of the Non-ConformitiesClient Feed Back Reports
Corrective & Preventive Action Taken for Non ConformitiesRoot Cause Analysis and Corrective & Preventive Action Reports
Screening & Induction of Quality PersonnelTraining and Monitoring Performance
Performance Measurement and Review SystemCorrective and Preventive Measures
Minutes of the regular Quality Meetings with IMS Staff with the ClientRoot cause analysis of the observations and clearance of non-conformities, if any
Minutes of the Quality Meetings conducted by the Project Site In-chargeCorrective & Preventive Action Reports
Root Cause Analysis of the Non-conformances observed.Evaluation of Vendors & Service Providers
Corrective & Preventive Action TakenRecord of Vendor Performance
Performance of Sub-ContractorsEvaluation of Sub-Contractors
Monitoring Parameters
Zero Fatal Accident Certificate
Health, Safety & Environmental Violation Memoranda
Salient Features Of Occupational Health & Safety As Per Per Iso 45001:2018 & Environmental Management System As Per ISO 14001:2015
Proactive MeasuresMonitoring Measures
Project Health, Safety & Environmental PlanGeneral HSE Inspection
Project HSE Committee MeetingEquipment Fitness certificate
Group Risk AssessmentPlant & Machinery Inspection
Health, Safety & Environmental TrainingElectrical Inspection
Pep TalkHealth, Hygiene & Environmental Inspection
Daily Safety Pledge at Tool Box MeetingPeriodic Checking
Work Permit SystemPeriodic Checking
Screening & Induction of workmenPeriodic Checking
Performance Measurement and Review SystemCorrective and Preventive Measures
Internal Health, Safety & Environmental AuditsIncident Reporting System
Management Review meetingAnalyzing the first aid cases
Performance of Sub-contractorsEvaluation of Sub-contractors
Incident StatisticsReview and corrective measures
HSE Rewards & PunishmentPeriodic Checking
Annual Safety Trophy SchemeEvaluation of performance of the Divisions
Safe Million Man hour CertificatesPeriodic Checking
Monitoring Parameters
Zero Fatal Accident Certificate
Health, Safety & Environmental Violation Memoranda

Besides the enforcement of required measures and management controls, Personal Protective Equipment as per needs of the operations, are provided. Health, Safety & Environmental awareness among employees is created and maintained through regular training programmes. Management interacts with the Work Force by regular meetings and has adopted Risk Based thinking in managing all the Projects. GDCL has opted for Integrated Management System as per ISO 9001:2015 (For Quality Management System), ISO 14001:2015 (For Environmental Management System) and ISO 45001:2018 (For Safety Management System) with effect from 01 April 2019. The Integrated Management System is being followed in all offices and Project Sites of GDCL and regular internal and external audits are conducted and reviewed by top management during the Management Review Meetings on quarterly basis for continual improvement in the Integrated Management System.